chinatimeast
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
CNOOC BN Submarine/Offshore Pipeline Landing Project (Year 2005)
Floating Hose Inspection, Displace, Installation
Zhaodong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2010)
CNOOC Panyu Submarine/Offshore Pipeline Landing Project (Year 2004)
Weizhou 12-2 Oilfield Phase Development Project (Year 2016)
Philippines Iligan 20MW [Net] Steam Turbine Genset Project -- Offshore Intake and Drainage Pipeline Project Commencement
Nov. 22nd, The first group of Tianjin Timeast Offshore Engineering Co., Ltd. staff arrived at the site to perform Offshore Pipe Laying preparation.
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005)
Yuedong Oil Submarine/Offshore Pipeline Post-Trenching Project (Year 2011-2012)
Copyright:@2020-2021