Do you know the construction process of Aluminum Honeycomb Panel?

Author:yoobond 2020-05-21 10:54:19 277 0 0

As an Aluminum Composite Panel Supplier, share the construction process with you.

Edge installation:

The corners, ends, and sides of the wall panel should have closing edges. The types are: outside corner, outside table, daughter wall cap, door outside, door outside, window outside, window outside. , Under the window, inside corners, seams, etc. The cross-sectional shape of the edge board must focus on waterproofing, and also consider strength and stiffness. At the same time, it must be beautiful, elegant, and easy to manufacture and install. Most of the accessories such as edge board and corner board are located at the corners of the building, which is more conspicuous. Its good shape will enhance the effect of the building facade. Checking the width and angle of the bending surface is to ensure the appearance quality of the building. Important indicators. General requirements for edge installation: straight edge, interface fit, natural corners, and reliable connection. Edges on doors, desks, etc. should be installed before the wallboard, and corners on outer corners, gable corners, and door sides should be installed behind the wallboard. Rivets should be used for the connection of the edge connection interface, and a waterproof silicone should be used at the interface. The straightness and horizontal control of the edge trim should be level, and the straightness, verticality, and horizontality of other trim edges should be horizontal ruler. The allowable deviation of straightness, horizontality and verticality of the closed edge is L / 800, and not more than 25mm.

Installation and standing requirements for Aluminum Honeycomb Panels for Wall Materials.

The installation order of aluminum honeycomb panel wall shall be from one end of the wall. The wall with the doorway should be fixed from the doorway to both sides. Use whole panels on both sides of the doorway. Take the operation method of installing the wall with the opening.

The method of accommodating the opening is to use adhesive and wood screws to fasten it at the same time. Then the plugging effect is poor. Therefore, rear plugs should not be used in aluminum honeycomb panel walls. The position of the keel wall needs to be accurately lined, but the wall connecting the beam and column should be cut according to the shape of the beam and column to ensure that the contact surfaces are consistent. Positioning frames should be used for keel walls arranged in a “I” shape. When the keel is misplaced, it is advisable to erect the keel at both ends first, hang the wire straight, and then erect the middle keel to align with the wire. The pile layer is pasted to the front board, and it should be hung vertically. When pasting back, the inspection ruler should be used to level the adjacent board. Apply adhesive on the second layer of board, and a short section (approximately 100 mm) should be cut off on the left and right sides as the air vent, so that the board can be adjusted smoothly.

For the adhesive of aluminum honeycomb panel, if polyvinyl alcohol glue and mixed gypsum are used, the setting time should be properly controlled. In particular, when pasting surface boards and installing aluminum honeycomb panels on the keel wall, the solidification speed should allow enough time to adjust the surface flatness. It is necessary to prevent only the operating speed from affecting the appearance of the plate surface. The adhesive should not be used too much and too thick. The thickness of Aluminum Honeycomb Panel joints is not more than 5 mm, and the thickness of veneer bonding is preferably 3 mm.